Set in the capital city of Telangana, PAWAN POWER & TELECOM LIMITED is inspired and dedicated to
its motto-
"Energizing the Future". With over 35 years of quality service in the Power and Infrastructure
sector, the
Company has got wide variety of products to offer. We ensure the highest quality production with the
highest
quality raw material being used. With state of the art manufacturing facility and strict quality
control at
every step we ensure the best quality of wires, cables and conductors are manufactured and delivered
to our
customers.
Since incorporation we have emerged not just as a mere manufacturer but as a brand of
Trust, Quality
and Assurance. Pawan-Cab caters to all energy requirements pertaining to Industrial, Turnkey
Projects, Power
Distribution Companies and Infrastructure. Due to our uncompromising product quality, Today we can
proudly
say we are one of the most preferred and trusted cable manufacturers in the country.
With the exponential increase in demand of power and various electrification projects being
introduced by the government, we would definitely continue to be an integral part in the
development and
electrification of the country.
For the growth of the nation, Electrical power supply is a major source of development.
Pawan Power has always given the best quality material in the quickest time frame.
Whenever the nation was struck with any disaster, Pawan Power stepped in and helped
in restoring power in the damaged regions with the top most priority. For us, Commitment is not just a mere word.
1) Restoring of Power in Tsunami affected areas of Andaman and Nicobar Islands
On 26th December,2004 when the disastrous Tsunami struck which caused major loss of
life and extreme power outage, Pawan Power was the first company to respond to the situation.
Within a record time of 15 days, the company supplied with 100 kilometer of LT Aerial Bunched
Cable to the Power Grid Corporation of India and began the Phase 1 of power restoration.
2) Fire accident in Kothagudam Thermal Power Station:
A major fire accident in the Kothagudam Thermal Power Station caused a power outage.
Pawan Power was the first one to accept the challenge and supplied 50 kilometer of FRLS Copper
Control cable in a record time of 11 days.
3) Phethai Cyclone 2018:
On 17th of December,2018 when the Phethai Cyclone struck Vishakapatnam, there was heavy damage to
all the electric lines and this led to a major blackout. As the most trusted company, Pawan Power
was extremely quick and supplied with 250 kilometers of Aerial Bunched cable in a record time of 8 days.
4) Titli Cyclone 2018:
In October 2018, the coastal regions of Andhra Pradesh were severely affected due to the havoc caused by Titli cyclone.
Restoration of power was carried out by Pawan Power and 150 kilometer of Aerial Bunched Cable was supplied within 1 week time.